Storage during a renovation
Clearing the apartment for a renovation costs ₪40 per m³ per month. A 3 room apartment is 18 to 24 m³, so ₪720 to ₪960 a month, plus ₪1,800 to collect. Three months of a 18 m³ apartment is ₪2,160 in storage. Minimum 30 days.
The sealed room never works
Everyone tries it once. You push the furniture into the smallest bedroom, tape plastic over the door, and tell yourself the dust will stay out. It does not. Plaster dust moves through a sealed room the way water moves through a sieve, and it settles in upholstery, in mattresses, in the mechanism of every drawer.
The second problem is worse and less obvious: the contractors cannot work. A sealed room is a room they cannot enter, so the electrician reroutes around it, the floor goes down in two stages, and the renovation takes longer than the quote. Empty apartments finish faster.
The third problem is you. Living inside a renovation with your furniture stacked in a corner is a specific kind of unpleasant that lasts as long as the project does, and renovations here run long more often than they run short.
Renovations we see
- A full gut of an old apartment. Everything goes. Usually eight to sixteen weeks, sometimes longer.
- Kitchen and one bathroom. The kitchen contents and the living room go, the bedrooms stay behind a door.
- Floors throughout. Short, brutal, and impossible with furniture in the apartment.
- Buying an apartment that needs work before you move in. Your contents arrive from the old place and go straight into storage until the new one is ready.
What it costs against what it saves
| Apartment size | Estimated volume | Per month, launch price (₪40 per m³) | Regular price (₪50 per m³) | Transport, one-off (same price from every address) |
|---|---|---|---|---|
| Studio | 6 to 8 m³ | ₪240 to ₪320 | ₪300 to ₪400 | ₪950 |
| 2 rooms | 10 to 14 m³ | ₪400 to ₪560 | ₪500 to ₪700 | ₪1,000 to ₪1,400 |
| 3 rooms | 18 to 24 m³ | ₪720 to ₪960 | ₪900 to ₪1,200 | ₪1,800 to ₪2,400 |
| 4 rooms | 24 to 32 m³ | ₪960 to ₪1,280 | ₪1,200 to ₪1,600 | ₪2,400 to ₪3,200 |
| 5 rooms | 32 to 40 m³ | ₪1,280 to ₪1,600 | ₪1,600 to ₪2,000 | ₪3,200 to ₪4,000 |
Transport is ₪100 per m³ with a ₪950 minimum, one-off, the same from every address we collect from and with no surcharge for the floor or a missing lift. The return trip is priced by the same formula.
A four month renovation of a 24 m³ apartment is ₪960 a month, so ₪2,880 for three months and ₪5,760 for six. Set that against one sofa, one mattress and a dining table you would have to replace, and against the weeks the contractors save by having the floor to themselves.
Packing is optional at ₪30 per box if the crew does it, and free if you do it yourself. See the full pricing for the rest.
How to time it
- Book the collection for the day before the contractors start. Not the same morning. Collections run 8:00 to 17:00 and you want the apartment empty when they walk in.
- Decide what is not coming back. A renovation is the best moment to get rid of things. You pay by volume, so it is money as well as space.
- Keep out what you need while you live elsewhere. Clothes, laptops, documents, the coffee machine.
- Book the return with a week of slack. Renovations finish late, and a floor needs to cure before furniture stands on it.
- Bring it back in two waves if it helps. Beds and kitchen first, the rest once the painters are actually gone.
Dates move, and that is fine. Cancel more than 48 hours before the collection slot and you pay nothing at all. Cancel inside 48 hours and you are charged the transport cost. If your renovation is on an apartment you are moving into, read storage between apartments as well, and for the whole picture, apartment storage in Israel.
Questions about renovation storage.
What does three months of renovation storage cost?
A 3 room apartment of 18 m³ is ₪720 a month, so ₪2,160 for three months, plus ₪1,800 to collect and a similar amount to bring it back.
Can I store only part of the apartment?
Yes. You pay for the volume that leaves, nothing else. A kitchen renovation usually means the living room and the kitchen contents go and the bedrooms stay. Note that the transport minimum applies to any collection, however small.
The renovation always runs late. What happens then?
Nothing. You pay monthly, in whole months, until you ask for it back. Billing is in whole months, not pro rata by the day, and there is no fixed end date to renegotiate.
Can I get something back mid renovation?
Yes. Pick it in the personal area and it comes back within a few days. People do this for tools, for a desk once the study is finished, and for the kettle.
Is it not cheaper to cover everything in plastic?
Plastic does not stop plaster dust getting into a sofa or a mattress, and it does not give the contractors floor space to work. One ruined sofa costs more than three months of storage for a 18 m³ apartment, which is ₪2,160.
Do you take the kitchen apart?
We take wardrobes and shelving apart and reassemble them at the facility. Taking wardrobes apart and putting them back together: ₪150 to ₪340 per wardrobe by the number of doors, ₪30 for a bookcase. Fitted kitchens are a job for the renovation contractor, not for us.
What about insurance during the works?
Contents insurance with us is optional and covers the items while they are in our facility. Every ₪1,000 of declared value costs ₪1.8 per month. Whatever stays in the apartment is between you and the contractor.
Keep reading.
Give them an empty apartment.
What will it cost me?A price in a minute. No phone call, no commitment.